Project Description
RDM updated the prior Pavement Management System for all three CRAA airports – John Glenn Columbus International (CMH), Rickenbacker International, (LCK) and Bolton Field (TZR) airports. Airside and landside pavements at CMH and LCK were included in the scope of work, while TZR was landside only, since airside was performed by the Ohio Department of Transportation. The total pavement inspected was approximately 45.5 million square feet, of which, 33.7 million were airside pavements. A 5-year M&R program was updated and data was integrated with the airport’s existing GIS system. PCN values were calculated for all runways.